首页 > 买房 > Sungai Besi, Kuala Lumpur > Quaver Residence




1017 - 1701 平方尺
3 - 3
-
-
发展商执照号码
30064/04-2027/0063(A)
广告与销售准证号码
30064-1/08-2027/0665(A)-(S)
执照有效期
开始: 2022 年 4 月 26 日
结束: 2027 年 4 月 25 日准证有效期
开始: 2026 年 8 月 24 日
结束: 2027 年 8 月 23 日合约类型
Schedule H(分层)
建造期
36 个月 + 18 个月
准证状态
正常
项目资料
状态
已完工
完工年份
A - Q3 2026, B - Q3 2026
项目类型
住宅, 高楼
总单位
684 个单位
地段面积
3.406 英亩
座
A, B
发展商
CHIN HIN PROPERTY
层
A - 20, B - 29
地契
租赁地契 (2091)
管理费
RM 0.33 每平方尺,含 10% 偿债基金
亮点
- MRT Serdang Raya Utara 542 米
- 全是 3 间房 1,017–1,701 平方尺
- 2026 年完工 – 可看实际单位
- RM522,000 起
- APU 校园 643 米
关于这个项目
Quaver Residence,Sungai Besi:Chin Hin 的租赁地契家庭服务式公寓
Quaver Residence 是 Chin Hin Property 在吉隆坡 Sungai Besi 发展的租赁地契服务式公寓,共 684 个单位,地契到 2091 年。每个单位都是 3 间房,1,017 至 1,701 平方尺,RM522,000 起。大楼已经完工,2026 年 9 月已交屋。适合想要真正宽敞空间又靠近 MRT 的家庭,以及瞄准 APU 学生和职员的房东。
Quaver Residence 适合谁、谁该跳过
适合住 2 间房已经不够用、想要三间像样的房间又不想离开 MRT 沿线的成长中家庭。适合想把房间租给 Asia Pacific University(APU)学生或职员的房东,APU 距离 643 米。也适合想先看到完工单位才付钱的买家,因为 CCC 在 2026 年 8 月 8 日已经发出。如果你想要给单一租客的小型低总价单位就请跳过,这里没有 studio 或 1 间房。很在意地契年限的人也请跳过:地契到 2091 年,距离现在约 65 年。
Quaver Residence 交通方便吗?
Putrajaya Line 的 MRT Serdang Raya Utara(PY31)离项目直线距离 542 米。APU 643 米,休闲公园 938 米,Sekolah Sukan Bukit Jalil 直线距离 1,275 米。项目位于 Sungai Besi 靠近 Serdang 和 Seri Kembangan 的边缘。
Quaver Residence 的户型与每月开销
所有单位都是 3 间房,1,017 至 1,701 平方尺,据发展商说包括复式格局和大阳台。预计月供约 RM2,166 起(90% 贷款,35 年,约 4.3%;实际视你的贷款条件而定)。管理费报价每平方尺 RM0.33,已包括 10% 的偿债基金。CCC 在 2026 年 8 月 8 日发出,2026 年 9 月已交屋,所以不用等施工。
Sifu 观点
取舍在于空间对比地契年限。你拿到的是至少 1,017 平方尺的完整 3 房,离 MRT 站 542 米,大楼已经盖好。在 KL,RM522,000 买到这么大的家很划算。犹豫的理由是地契只到 2091 年,将来的买家和他们的银行会看得很仔细,而且 684 个单位的大楼,你要跟很多邻居共用电梯和设施。打算持有多年的家庭或 APU 房东值得看;想要永久地契或小型出租单位就跳过。
重点资料
- 类型:服务式公寓
- 发展商:Chin Hin Property
- 地契:租赁地契(至 2091 年)
- 总单位数:684
- 建筑面积:1,017–1,701 平方尺(全是 3 间房)
- 价钱:RM522,000 起
- 状态:已完工 – 2026 年 9 月交屋
- 最近的铁路:MRT Serdang Raya Utara(PY31),直线距离 542 米
优缺点
户型图

位置地图
工地进度
- 2024 年 5 月 10 日工程进度(截至 2024 年 Q2)
- 2024 年 5 月 10 日工程进度(截至 2024 年 Q2)
- 2024 年 5 月 10 日工程进度(截至 2024 年 Q2)
- 2024 年 5 月 10 日工程进度(截至 2024 年 Q2)
- 2024 年 5 月 10 日工程进度(截至 2024 年 Q2)
- 2023 年 8 月 4 日工程进度(截至 Q3 2023 (iv))
- 2023 年 8 月 4 日工程进度(截至 Q3 2023 (iii))
- 2023 年 8 月 4 日工程进度(截至 Q3 2023 (ii))
- 2023 年 8 月 4 日工程进度(截至 Q3 2023 (i))
- 2022 年 12 月 27 日工程进度(截至 2022 年 Q4)
- 2022 年 12 月 27 日工程进度(截至 2022 年 Q4)
- 2022 年 12 月 27 日工程进度(截至 2022 年 Q4)
关于发展商:Chin Hin Property
Quaver Residence 由 Chin Hin Property 发展。Chin Hin Group Property Berhad 在 Bursa Malaysia 主板上市(CHGP,7187),是一家房地产发展商,其子公司和合资公司在 KPKT 登记册中有 14 个住宅项目:3 个已完工、11 个在建,没有任何项目被列为病态或烂尾。它在 2018 年之前叫 Boon Koon Group。
Sifu 观点:Quaver Residence 为什么值得关注
Quaver Residence 的发展商是在 Bursa Malaysia 主板上市的集团:Chin Hin Group Property Berhad 在 KPKT 登记册中有 14 个住宅项目,没有任何项目被列为病态或烂尾。这个项目共 684 个单位,起价 RM522,000,租赁地契到 2091 年,完工年份是 2025 年。要衡量的是,集团登记的 14 个项目中只有 3 个已完工,所以已交付楼盘的记录还不长。参观发展商已完工的楼盘,可以看到装修质量和管理情况,PropertySifu 也可以帮你查 KPKT 记录和施工进度。
- 上市: Bursa Malaysia 主板,CHGP(7187),自 2004 年起在 Bursa Malaysia 交易;2018 年 9 月之前叫 Boon Koon Group Berhad
- 创立: 2001 年注册成立,原名 Boon Koon Group Berhad;2018 年 9 月改名为 Chin Hin Group Property Berhad
- 总部: Menara Chin Hin, 8th & Stellar, Sri Petaling, Kuala Lumpur
- 控股公司: Chin Hin Group Berhad,在 Bursa Malaysia 主板上市(直属控股公司)
- 土地储备(公司数据): 遍布北马、南马和巴生谷共 148 英亩,总发展价值合计 RM93.6亿(2025 年年报)
- 合资伙伴: Fiamma Holdings Berhad 持有 Dawn Land(Dawn KLCC)、Aricia(Aricia Residences)和 Sinaran Urusjuta(Divine KLCC)的 30%;集团持有 70%
- 第一个房地产项目: Petaling Jaya 的 Aera Residence,与 Platinum Eminent Sdn Bhd 的联合经营(集团参与权益 60%)
- 完整发展商资料与 KPKT 记录: PropertySifu 上的 Chin Hin Property
- 烧烤区
- 游戏室
- 花园
- 健身房
- 按摩池
- 多功能礼堂
- 阅读室
- 游泳池
Chin Hin Group - Young and raring to go
发布于 12/4/2022
November 05, 2021 |
Things might have slowed down for many companies since the Covid-19 outbreak in March 2020, but integrated builder Chin Hin Group Bhd has gone against the tide, moving aggressively towards expansion instead.
In this year alone, Chin Hin Group has acquired controlling stakes in Chin Hin Group Property Bhd (CHGPB) (formerly Boon Koon Group Bhd), Kayangan Kemas Sdn Bhd, and kitchen cabinet and wardrobe manufacturer Signature International Bhd.
The home-grown building material specialist, which started its journey back in 1974 as a small hardware shop in Alor Setar, Kedah, has now evolved into an integrated developer with diversified businesses encompassing building material trading and manufacturing, property development, construction, and home and living, as well as solar energy.
On top of this, CHGPB has also accumulated landbank in strategic locations, such as Cyberjaya in Selangor, Jalan Kuchai and Bangsar South in Kuala Lumpur, and Serendah in Selangor.
Chin Hin Group managing director and executive director Chiau Haw Choon tells EdgeProp. my the landbanking activities will continue for CHGPB and the growth momentum will continue in the next three to five years.
Chiau: “I am an entrepreneur. Generally, en¬trepreneurs are optimistic and far-sighted people. I just feel there is never a bad time. Any time is just a time to do a certain thing”.
No time is a bad time
The intensive acquisitions of this new kid on the block amidst a pandemic-ridden market have definitely raised eyebrows.
What has prompted such boldness from this 37-year-old developer, whose current track record in the real estate arena are Novum Bangsar South in Kuala Lumpur, a joint venture development with with Kedah-based Eupe Corp Bhd, and G Residence near Kuchai Lama in Kuala Lumpur as well as two under-construction high-rise residential projects – 8th & Stellar in Sri Petaling, Kuala Lumpur and Aera Residences in Petaling Jaya, Selangor?
In response, Chiau says: “I am an entrepreneur. Generally, entrepreneurs are optimistic and far-sighted people. I just feel there is never a bad time. Any time is just a time to do a certain thing”.
“Like now is a good time to accumulate landbank and assets, focus on digitalisation and working on our books. Hence, we did not launch any new developments last year and this year, as we feel it is not a good time for new launches,” adds Chiau, who is also the son of the group’s co-founder and deputy chairman Datuk Seri Chiau Beng Teik.
This is especially so for the property development segment, as purchasers would want to view the projects, show units, talk to the sales representatives or have short tours of the surroundings, and all these are not allowed during the movement control order periods.
Hence, Chin Hin Group has turned its strategy to accumulating assets, in expectation of a market recovery in 2022.
“Looking at the market condition, we foresee next year will be a year of recovery, hence the most important thing right now is for us to accumulate landbank and do our project planning,” he says.
Chiau notes that the project planning and the submissions to get authorities’ approvals will take about six months to one year. “If we had taken a wait-and-see approach and had only started buying [land] next year, by the time I had got my preparation done, I would have missed the boat.”

Increasing its footprint in the Klang Valley
“Currently, our undeveloped landbank has an estimated gross development value (GDV) of RM3.5 billion. This will keep us busy until 2027,” he says, but declines to reveal the size of the landbank.
Earlier in February this year, CHGPB announced its plan to spend RM269 million to acquire 81.9 acres of land in the Klang Valley to develop five property projects and its aim to launch projects worth RM3.73 billion in GDV in the next two years, including a township development in Rawang.
Before ending 2021, CHGPB is looking at unveiling a high-rise residential project in Seri Kembangan, Selangor by the fourth quarter of this year.
Dubbed Quaver Residence, the freehold development comprises two 40-floor serviced apartments offering 684 units with built-ups ranging from 1,017 sq ft to 1,850 sq ft and some retail units. Priced from RM500,000 per unit, it’s expected to complete by 2025.
“Next year, we will be launching a minimum of three projects in the Klang Valley,” enthuses Chiau, adding that one of the projects which CHGPB had planned to unveil this year has been pushed to 2022 due to the market condition.
The project is a 34-storey office tower in Bangsar South with a net sellable area of 213,657 sq ft. Originally measuring 0.53 acres, the land is now 0.48 acres after part of it has been surrendered for a light rail transit (LRT) development. It is located right next to KL Gateway. The development is expected to be completed by 2025.
One of the unique selling points of the office tower is there will be a link bridge to Southview Apartment and KL Gateway Mall, which means it will have direct access to an LRT station.
Although companies have started adopting a hybrid of work-from-home and work-in-office, he observes there are still needs for offices following the economy’s reopening.
“Personally, although I enjoy remote working – having meetings any place any time, I still miss the physical meet-ups with the staff and business partners, to interact with them and listen to their needs. This is something irreplaceable,” says Chiau.
“Next, we also have a high-rise residential development in Kinrara, Puchong, Selangor. The development is expected to come with a GDV of RM400 million. It’s sited on a freehold plot near Giant Kinrara and close to an LRT station. This will also be our maiden launch in Puchong,” he shares.

Slated for completion by 2026, the freehold serviced apartment will have two 43-floor towers, offering 833 units with an estimated selling price starting from RM350,000.
Other than these two projects, CHGPB is also busy planning for a township development in Rawang with a GDV of RM909 million.
“The 60-acre freehold plot is located next to the Rawang Bypass and close to Templer Park. For now, we are planning to launch townhouse and Rumah Selangorku projects in the first two phases. More details will be unveiled when we finalise the planning,” he says.
Beyond 2022, Chiau adds that CHGPB has now started planning the new launches for 2023. There will be integrated developments in Old Klang Road, Kuala Lumpur, and Cyberjaya, Selangor, with an estimated collective GDV of RM1 billion.
“Currently we are focusing on the growth corridors in the Klang Valley. Having said that, we do not discount the possibility of land acquisitions in other states if the right opportunity comes and fits into our overall growth strategy,” notes Chiau.

Signature International to go big next year
On the latest addition to the group’s core business – Signature International Bhd, Malaysia’s largest kitchen cabinet and wardrobe manufacturer, Chiau reveals that there will be plans to expand its market presence next year.
“We are going to launch a new business model in the first quarter next year. Signature Kitchen will be repositioned as a design and build business model. On top of design-and-build services, there will be furniture pieces for individuals who are looking for home improvement as well,” he adds.
The idea came from customers’ feedback, on the hassle they have been through when looking for interior designers and suppliers themselves, the lack of transparency in pricing, inconsistent delivery schedule and unsatisfactory workmanship. Prompted by this, Chiau says the team saw a big potential in introducing a new customer experience for homebuyers.
He adds that this includes building a new showroom with a built-up size of 50,000 sq ft to showcase different design themes for consumers’ reference, in-house designers that offer consultancy services and a ready-made furniture section.
“This will be a one-stop centre that covers everything in your home, including design-and-build service. Transparency is something that we want to emphasise. Every item will be listed down in the quotation for the customers to choose,” he says.
According to him, a total investment of RM40 million will be put into this new business model to transform this traditional household business and to elevate Signature’s brand in the market.
Integrating solar energy with property development
As one of Chin Hin Group’s core businesses, the solar energy division has been contributing recurring income for the group.
Notably, it has an order book of over RM500 million, among which is a RM175 million 50 megawatt solar park project in Perlis. Lagenda Properties Bhd has also appointed Solarvest as its solar photovoltaic (PV) system partner to build the largest sustainable affordable township in Malaysia.
“In our future property developments, we could also add in the solar PV system as one of the features. As energy cost is rising, we foresee the adoption of solar energy will gain popularity and become more common,” Chiau points out.
来源: edgeprop.my
发展商往绩
KPKT 房屋部登记记录 · 截至 2026-10-27
CHIN HIN PROPERTY 及 10 家关联公司
目前没有项目被 KPKT 列为进度落后、病态或烂尾。
资料来源:TEDUH,KPKT。集团公司名单和出处见发展商页。 看发展商完整纪录 ›
买家常见问题
房贷月供计算器
比较银行利率

Maybank
- 利率 起 3.60% 年利率
- 月供 RM 1687.40

Public Bank
- 利率 起 3.55% 年利率
- 月供 RM 1675.67

CIMB
- 利率 起 3.50% 年利率
- 月供 RM 1663.98

Hong Leong Bank
- 利率 起 3.65% 年利率
- 月供 RM 1699.16

RHB
- 利率 起 3.55% 年利率
- 月供 RM 1675.67






.jpeg)


.jpeg)

.jpeg)



.jpeg)



.jpeg)






























