New project in Setapak, Kuala Lumpur, by Mah Sing's Group.
| Price range | RM 472,051 - 559,468 |
|---|---|
| Unit size | 850 - 1044 sqft |
| Bedrooms | 3 - 4 |
| Total units | 2852 |
| Completion year | 2026 |
| Land area | 5 Acre |
| Maintenance fee | RM 0.30 per sqft excluded 10% sinking fund |
| Developer | Mah Sing's Group |
| Subsidiary company | Nova Century Development Sdn Bhd |
| Developer license no. | 10168/01-2027/1054(A) |
| Advertising permit no. | 10168-4/11-2025/0341(N)-(S) |
| Schedule type | Schedule H |
| Construction period | 36 months + 18 months |
M Astra is a serviced-residence development in Setapak, Kuala Lumpur, by Bursa Malaysia-listed Mah Sing Group Berhad. Priced from RM472,051, the 2,852-unit scheme is pitched as affordable family living wrapped in generous landscape space (per the developer), on the northern edge of the city.
Connectivity & Location
LRT Wangsa Maju (KJ3) is 1,379m straight-line from the site — close enough to matter but not a walk-to-train distance — while the daily grid is strong: SJK(C) Wangsa Maju 249m, Columbia Asia Hospital 578m, Open University Malaysia 573m, Setapak Central mall 740m and Taman Pinggiran Sungai Bunus 652m straight-line. DBKL zones the pocket mixed development (MX, plot ratio 4), so expect continued build-up around the site.
Layouts & Living
Units run 850 to 1,044 sqft across 3 to 4 bedrooms — practical, family-sized layouts rather than compact investor cuts. Estimated instalments start from about RM1,958/month (90% loan, 35 years, ~4.3%; depends on your loan profile). Project status and completion date are not stated on the card, so confirm the build stage and VP timeline before committing.
The Sifu View
M Astra's honest appeal is family-sized space at an affordable ticket near everyday amenities — from RM472,051 it sits only modestly above the RM442,702 median across the 6 Setapak projects on this site, and it buys genuine 3–4 bedroom room. Buy it for an own-stay or a long-hold family address. But be honest about scale and access: at 2,852 units this is an exceptionally large scheme, so lift queues, facility crowds and a deep resale/rental pool are real; the LRT is about 1.4km away, so it is a car-leaning address. Verify the status on the card and test the Setapak commute yourself first.
Key Features
| Type | Size | Bedrooms | Bathrooms | Car parks |
|---|---|---|---|---|
| Type A | 850sqft | 3 | 2 | - |
| Type A1 | 894sqft | 3 | 2 | - |
| Type B | 1000sqft | 4 | 2 | - |
| Type C | 1000sqft | 4 | 2 | - |
| Type B1111 | 1044sqft | 4 | 2 | - |
| Type C111 | 1044sqft | 4 | 2 | - |
KPKT (Ministry of Housing) filing (as of 2026-08-28): construction status "Siap Dengan CCC" (completed, CCC issued); 1425 of 1426 units sold across 1 phase; CCC issued 2026-04-20. Check any Malaysian project’s KPKT record