Developer profile · KPKT records

GuocoLand Malaysia (GuocoLand (Malaysia) Sdn Bhd)

Last updated 28 Oct 2026
Who is GuocoLand Malaysia?

GuocoLand Malaysia, the Hong Leong Group's property arm and no longer listed since Bursa Malaysia removed it on 18 August 2026, has 44 housing projects in the KPKT register under seven companies, including two joint ventures and an associate: 36 completed, 6 under construction and 2 with the permit cancelled, none Sick or Abandoned.

  • 44 projects in the KPKT register
  • 36 completed
  • 6 under construction
  • 2 with the permit cancelled
  • None Sick or Abandoned

Has GuocoLand Malaysia handed over on time? What the KPKT register shows

KPKT's TEDUH register (as at 27 Oct 2026) lists 44 housing projects under 7 GuocoLand Malaysia companies in 2 states: 36 completed, 6 under construction, 2 with the permit cancelled. None is classed Sick (Sakit) or Abandoned (Terbengkalai).

Of the 36 completed projects, 22 have both a handover deadline and a completion date in the register: 3 handed over on or before the deadline (the extended deadline where KPKT approved an extension); 11 handed over or certified complete after that deadline; 8 received the completion certificate before the deadline (handover date not recorded).

13 projects had the delivery period extended with KPKT approval.

Completed projects — the 12 most recent of 36

Project (KPKT name)AreaUnitsHandover deadlineCCC / handoverAgainst deadline
ARECA @ PANTAI SEPANG PUTRAKPKT 7577-11SepangSelangor623 Feb 20271st sale agreement 3 Feb 2025CCC 18 Sep 2026CCC before deadline; handover not recorded
EMERALD 9 CHERASKPKT 19644-3Emerald 9 · on PropertySifuHulu LangatSelangor1,0724 Jun 2026Extended 12 months from 4 Jun 20251st sale agreement 4 Jun 2022CCC 31 Mar 2026CCC before deadline; handover not recorded
BLOOMING RESIDENCEKPKT 9722-16GombakSelangor1392 Feb 20261st sale agreement 2 Feb 2024CCC 9 Oct 2025
Handover 9 Oct 2025
116 days before
BLOOMING RESIDENCEKPKT 9722-15GombakSelangor1614 Jan 20261st sale agreement 4 Jan 2024CCC 3 Jun 2025
Handover 10 Jun 2025
208 days before
RESIDENSI EMERALD DAMAIKPKT 14068-2Kuala LumpurWP Kuala Lumpur78619 Oct 2025Extended 17 months from 19 May 20241st sale agreement 19 May 2021CCC 8 Nov 2024
Handover 16 Dec 2024 / 13 Jan 2025
279 days before
GARLAND RESIDENCE 2KPKT 9722-14GombakSelangor183—CCC 22 Dec 2023
Handover 27 Dec 2023
—
GARLAND RESIDENCE 2KPKT 9722-13GombakSelangor1533 Oct 2023Extended 5 months from 3 May 20231st sale agreement 3 May 2021CCC 19 Oct 202316 days after
EMERALD 9 CHERASKPKT 19644-1Emerald 9 · on PropertySifuHulu LangatSelangor81610 Apr 2024Extended 23 months from 10 May 20221st sale agreement 10 May 2019CCC 2 Aug 2023CCC before deadline; handover not recorded
MALLOW LAKEPARK HOMESKPKT 9722-12GombakSelangor1969 Feb 2023Extended 5 months from 9 Sep 20221st sale agreement 9 Sep 2020CCC 12 Jul 2023
Handover 31 Jan 2023 / 24 Jul 2023
165 days after
EMERALD HILLSKPKT 14068-1Emerald Hills · on PropertySifuKuala LumpurWP Kuala Lumpur77329 May 2023Extended 23 months from 29 Jun 20211st sale agreement 29 Jun 2018CCC 15 Aug 2022CCC before deadline; handover not recorded
GARLAND RESIDENCEKPKT 9722-11GombakSelangor29928 May 2022Extended 11 months from 28 Jun 20211st sale agreement 28 Jun 2019CCC 30 Sep 2021CCC before deadline; handover not recorded
ARECA @ PANTAI SEPANG PUTRAKPKT 7577-10SepangSelangor10025 Oct 2021Extended 6 months from 25 Apr 20211st sale agreement 25 Apr 2019CCC 6 Sep 2021CCC before deadline; handover not recorded

Handed over or certified complete after the deadline (11)

Project (KPKT name)AreaUnitsHandover deadlineCCC / handoverAgainst deadline
GARLAND RESIDENCE 2KPKT 9722-13GombakSelangor1533 Oct 2023Extended 5 months from 3 May 20231st sale agreement 3 May 2021CCC 19 Oct 202316 days after
MALLOW LAKEPARK HOMESKPKT 9722-12GombakSelangor1969 Feb 2023Extended 5 months from 9 Sep 20221st sale agreement 9 Sep 2020CCC 12 Jul 2023
Handover 31 Jan 2023 / 24 Jul 2023
165 days after
CHLOE RESIDENCEKPKT 9722-10GombakSelangor14224 Nov 20191st sale agreement 24 Nov 2017CCC 30 Jun 2020219 days after
SERENE @ PANTAI SEPANG PUTRAKPKT 7577-8SepangSelangor7218 Nov 20171st sale agreement 18 Nov 2015CCC 8 Jan 201851 days after
PANTAI SEPANG PUTRAKPKT 7577-1SepangSelangor28931 Dec 20001st sale agreement 31 Dec 1998CCC 9 Nov 20165,792 days after
PANTAI SEPANG PUTRAKPKT 7577-6SepangSelangor26718 Jun 20061st sale agreement 18 Jun 2004CFO 9 Nov 20163,797 days after
PANTAI SEPANG PUTRA FASA 2EKPKT 7577-7SepangSelangor1623 Jul 20061st sale agreement 23 Jul 2004CFO 9 Nov 20163,762 days after
PROMAKMUR DEVELOPMENT SDN. BHD.KPKT 9722-8GombakSelangor7414 Mar 20161st sale agreement 14 Mar 2014CCC 20 Apr 201637 days after
FASA 2CKPKT 9722-6GombakSelangor16120 Jun 20141st sale agreement 20 Jun 2012CCC 14 Aug 201455 days after
KOTA SELATAN INDAH SDN BHDKPKT 8760-8GombakSelangor17012 Oct 20131st sale agreement 12 Oct 2011CFO 30 Jul 2014291 days after
KOTA SELATAN INDAH SDN BHDKPKT 8760-9GombakSelangor5519 Mar 20141st sale agreement 19 Mar 2012CFO 25 Jul 2014128 days after
Show all 36 completed projects
Project (KPKT name)AreaUnitsHandover deadlineCCC / handoverAgainst deadline
ARECA @ PANTAI SEPANG PUTRAKPKT 7577-11SepangSelangor623 Feb 20271st sale agreement 3 Feb 2025CCC 18 Sep 2026CCC before deadline; handover not recorded
EMERALD 9 CHERASKPKT 19644-3Emerald 9 · on PropertySifuHulu LangatSelangor1,0724 Jun 2026Extended 12 months from 4 Jun 20251st sale agreement 4 Jun 2022CCC 31 Mar 2026CCC before deadline; handover not recorded
BLOOMING RESIDENCEKPKT 9722-16GombakSelangor1392 Feb 20261st sale agreement 2 Feb 2024CCC 9 Oct 2025
Handover 9 Oct 2025
116 days before
BLOOMING RESIDENCEKPKT 9722-15GombakSelangor1614 Jan 20261st sale agreement 4 Jan 2024CCC 3 Jun 2025
Handover 10 Jun 2025
208 days before
RESIDENSI EMERALD DAMAIKPKT 14068-2Kuala LumpurWP Kuala Lumpur78619 Oct 2025Extended 17 months from 19 May 20241st sale agreement 19 May 2021CCC 8 Nov 2024
Handover 16 Dec 2024 / 13 Jan 2025
279 days before
GARLAND RESIDENCE 2KPKT 9722-14GombakSelangor183—CCC 22 Dec 2023
Handover 27 Dec 2023
—
GARLAND RESIDENCE 2KPKT 9722-13GombakSelangor1533 Oct 2023Extended 5 months from 3 May 20231st sale agreement 3 May 2021CCC 19 Oct 202316 days after
EMERALD 9 CHERASKPKT 19644-1Emerald 9 · on PropertySifuHulu LangatSelangor81610 Apr 2024Extended 23 months from 10 May 20221st sale agreement 10 May 2019CCC 2 Aug 2023CCC before deadline; handover not recorded
MALLOW LAKEPARK HOMESKPKT 9722-12GombakSelangor1969 Feb 2023Extended 5 months from 9 Sep 20221st sale agreement 9 Sep 2020CCC 12 Jul 2023
Handover 31 Jan 2023 / 24 Jul 2023
165 days after
EMERALD HILLSKPKT 14068-1Emerald Hills · on PropertySifuKuala LumpurWP Kuala Lumpur77329 May 2023Extended 23 months from 29 Jun 20211st sale agreement 29 Jun 2018CCC 15 Aug 2022CCC before deadline; handover not recorded
GARLAND RESIDENCEKPKT 9722-11GombakSelangor29928 May 2022Extended 11 months from 28 Jun 20211st sale agreement 28 Jun 2019CCC 30 Sep 2021CCC before deadline; handover not recorded
ARECA @ PANTAI SEPANG PUTRAKPKT 7577-10SepangSelangor10025 Oct 2021Extended 6 months from 25 Apr 20211st sale agreement 25 Apr 2019CCC 6 Sep 2021CCC before deadline; handover not recorded
CHLOE RESIDENCEKPKT 9722-10GombakSelangor14224 Nov 20191st sale agreement 24 Nov 2017CCC 30 Jun 2020219 days after
VINTAGE HEIGHTS SDN. BHD.KPKT 7577-9SepangSelangor5612 May 20191st sale agreement 12 May 2017CCC 11 Mar 2019CCC before deadline; handover not recorded
SERENE @ PANTAI SEPANG PUTRAKPKT 7577-8SepangSelangor7218 Nov 20171st sale agreement 18 Nov 2015CCC 8 Jan 201851 days after
PANTAI SEPANG PUTRAKPKT 7577-1SepangSelangor28931 Dec 20001st sale agreement 31 Dec 1998CCC 9 Nov 20165,792 days after
PANTAI SEPANG PUTRAKPKT 7577-6SepangSelangor26718 Jun 20061st sale agreement 18 Jun 2004CFO 9 Nov 20163,797 days after
PANTAI SEPANG PUTRA FASA 2EKPKT 7577-7SepangSelangor1623 Jul 20061st sale agreement 23 Jul 2004CFO 9 Nov 20163,762 days after
PROMAKMUR DEVELOPMENT SDN. BHD.KPKT 9722-8GombakSelangor7414 Mar 20161st sale agreement 14 Mar 2014CCC 20 Apr 201637 days after
DC RESIDENCYKPKT 12315-1Kuala LumpurWP Kuala Lumpur37025 Mar 20161st sale agreement 25 Mar 2013CCC 25 Nov 2015CCC before deadline; handover not recorded
FASA 2CKPKT 9722-6GombakSelangor16120 Jun 20141st sale agreement 20 Jun 2012CCC 14 Aug 201455 days after
KOTA SELATAN INDAH SDN BHDKPKT 8760-8GombakSelangor17012 Oct 20131st sale agreement 12 Oct 2011CFO 30 Jul 2014291 days after
KOTA SELATAN INDAH SDN BHDKPKT 8760-9GombakSelangor5519 Mar 20141st sale agreement 19 Mar 2012CFO 25 Jul 2014128 days after
KOTA SELATAN INDAH SDN BHDKPKT 8760-7GombakSelangor131—CFO 1 Apr 2013—
EMERALD WESTKPKT 9722-7GombakSelangor162—CCC 9 Dec 2012—
EMERALD FASA 3FKPKT 9722-5GombakSelangor109—CFO 6 Jun 2012—
EMERALD FASA 3GKPKT 9722-4GombakSelangor122—CFO 7 Jul 2011—
EMERALD FASA 4A1KPKT 8760-6GombakSelangor26—CFO 29 Oct 2010—
EMERALD 4D & 4EKPKT 9722-3GombakSelangor116—CFO 9 Dec 2008—
EMERALD FASA 3DKPKT 9722-2GombakSelangor161—CFO 20 Aug 2008—
EMERALD, FASA 3EKPKT 8760-3GombakSelangor82—CCC 18 Jun 2008—
EMERALD FASA 3CKPKT 9722-1GombakSelangor173—CFO 7 Nov 2007—
EMERALD 3E(1)KPKT 8760-5GombakSelangor107—CFO 19 Sep 2007—
EMERALD 4AKPKT 8760-4GombakSelangor30—CFO 22 Aug 2007—
EMERALD FASA 3BKPKT 8760-2GombakSelangor189—CFO 20 Oct 2005—
EMERALD FASA 3AKPKT 8760-1GombakSelangor181—CFO 29 Aug 2005—

Under construction

Project (KPKT name)AreaUnitsKPKT statusHandover deadlineProgress
BUKIT RAHMAN PUTRA FASA 6KPKT 5759-12GombakSelangor1,352SmoothOn schedule27 Mar 20101st sale agreement 27 Mar 200730–100%
THE RISEKPKT 9722-18GombakSelangor36SmoothOn schedule15 Jun 2028Extended 12 months from 15 Jun 20271st sale agreement 15 Jun 202525–50%
THE RISEKPKT 9722-19GombakSelangor20SmoothOn schedule15 Jun 2028Extended 12 months from 15 Jun 20271st sale agreement 15 Jun 202524–35%
THE RISEKPKT 9722-20GombakSelangor21SmoothOn schedule15 Jun 2028Extended 12 months from 15 Jun 20271st sale agreement 15 Jun 202536–58%
THE RISEKPKT 9722-17GombakSelangor29SmoothOn schedule16 Aug 2028Extended 12 months from 16 Aug 20271st sale agreement 16 Aug 202526–35%
EMERALD 9 CHERASKPKT 19644-2Hulu LangatSelangor810SmoothOn schedule10 Oct 2028Extended 12 months from 10 Oct 20271st sale agreement 10 Oct 202451%

Permit cancelled or other KPKT status (2)

Project (KPKT name)AreaUnitsKPKT statusHandover deadlineProgress
PROMAKMUR DEVELOPMENT SDN. BHD.KPKT 9722-9GombakSelangor106Permit cancelledPermit cancelled—0%
BUKIT RAHMAN PUTRAKPKT 5759-19PetalingSelangor84Permit cancelledPermit cancelled—55%

Deadlines are counted from each project's first sale agreement, as KPKT records them; buyers who signed later have later deadlines. CCC = Certificate of Completion and Compliance; CFO = Certificate of Fitness for Occupation.

GuocoLand Malaysia at a glance

ListedNot listed — removed from Bursa Malaysia's Main Market (stock name GUOCO) on 18 August 2026 after a privatisation by GLL (Malaysia) Pte Ltd, a wholly-owned subsidiary of Singapore-listed GuocoLand Limited[3][4]
StartedIncorporated on 5 May 1920 as Bedford Plantations, Limited; named GuocoLand (Malaysia) Berhad on 28 October 2004[2]
Head officeMenara Guoco, Damansara City, Bukit Damansara, Kuala Lumpur[1]
LeadershipTang Hong Cheong — Chairman (non-executive)[1]
Noorbaizura binti Hermeyney — Managing Director (since 18 May 2023)[1]
Companies in the KPKT registerGLM EMERALD SQUARE (CHERAS) SDN. BHD. KPKT 19644[1][2]
GLM EMERALD HILLS (CHERAS) SDN. BHD. KPKT 14068[1][2]
DAMANSARA CITY SDN. BHD. KPKT 12315[1][2]
SABNA DEVELOPMENT SDN. BHD. KPKT 5759[1][2]
GLM EMERALD WEST (RAWANG) SDN. BHD. (50%) KPKT 9722[1][2]
GLM EMERALD EAST (RAWANG) SDN. BHD. (50%) KPKT 8760[1][2]
GLM EMERALD (SEPANG) SDN. BHD. (40%) KPKT 7577[1][2]
Websiteguocoland.com.my
ParentGuocoLand Limited (listed on the Singapore Exchange), through GLL (Malaysia) Pte Ltd; part of the Hong Leong Group[1][2]
Land bank (company figure)About 5,145 acres at 30 June 2025: 1,768 in Jasin, Melaka; 3,024 in Sepang; 353 in Rawang (the Sepang and Rawang land is held by associate and joint-venture companies)[1]
Former namesBedford Plantations, Limited (1920); Bedford Plantations Berhad (1966); Bedford Berhad (1984); Hong Leong Properties Berhad (1993); GuocoLand (Malaysia) Berhad (from 2004); now GuocoLand (Malaysia) Sdn Bhd[2][6]
Other businessesProperty investment (DC Mall; Tower REIT, which owns Menara Guoco, Plaza Zurich and Menara HLX) and a hotel (Sofitel Kuala Lumpur Damansara)[1]

GuocoLand Malaysia projects on sale on PropertySifu

Emerald 9

Cheras, Selangor · From RM493,000
KPKT 19644-1: Completed with CCC (2 Aug 2023)
KPKT 19644-3: Completed with CCC (31 Mar 2026)
Completed GuocoLand Malaysia projects nearby (KPKT):
  • EMERALD HILLS — 3.4 km, 2022
  • RESIDENSI EMERALD DAMAI — 3.6 km, 2025

Emerald Hills

Cheras, Selangor · From RM600,000
KPKT 14068-1: Completed with CCC (15 Aug 2022)
Completed GuocoLand Malaysia projects nearby (KPKT):
  • EMERALD 9 CHERAS — 3.6 km, 2026
  • EMERALD 9 CHERAS — 3.6 km, 2023

Who is GuocoLand Malaysia? The company behind the projects

GuocoLand (Malaysia) was incorporated on 5 May 1920 as Bedford Plantations, Limited. It became Bedford Berhad in 1984 and Hong Leong Properties Berhad in 1993, and took the name GuocoLand (Malaysia) Berhad on 28 October 2004 [2]. It is the property arm of the Hong Leong Group and a subsidiary of Singapore-listed GuocoLand Limited [1][2]. In February 2026, GuocoLand Limited's wholly-owned GLL (Malaysia) Pte Ltd, which held about 65.03% of the shares, proposed taking it private through a selective capital reduction paying RM1.10 a share [4]. Bursa Malaysia removed the company from its Official List on 18 August 2026 [3][5]; it now operates as GuocoLand (Malaysia) Sdn Bhd [6].

Its flagship is Damansara City in Damansara Heights, Kuala Lumpur: two office towers, the DC Residensi serviced apartments, the Sofitel Kuala Lumpur Damansara hotel and DC Mall [1]. The company calls itself the master developer of the Emerald series — Emerald Rawang, Emerald Hills in Alam Damai, Emerald 9 in Cheras and Emerald Sepang [1]. It says its remaining land bank was about 5,145 acres at 30 June 2025: 1,768 acres in Jasin, Melaka, 3,024 acres in Sepang and 353 acres in Rawang; the Sepang and Rawang land is held by its associate and joint-venture companies [1].

Emerald Rawang and Emerald Sepang are not wholly owned. GuocoLand Malaysia holds 50% of GLM Emerald (Rawang) Sdn Bhd, the parent of GLM Emerald West (Rawang) and GLM Emerald East (Rawang), with Hong Bee Realty Sdn Bhd holding the other half; it holds 40% of GLM Emerald (Sepang) Sdn Bhd, alongside Perbadanan Kemajuan Negeri Selangor (30%) and Hap Seng Consolidated Berhad (20%) [2]. The KPKT figures above count every project of these three companies in full. The two projects on PropertySifu are wholly owned: Emerald 9 is developed by GLM Emerald Square (Cheras) Sdn Bhd and Emerald Hills by GLM Emerald Hills (Cheras) Sdn Bhd [1].

According to the 2025 annual report, the chairman is Tang Hong Cheong and the managing director is Noorbaizura binti Hermeyney, appointed on 18 May 2023 [1].

Frequently asked questions

Is GuocoLand Malaysia still a listed company?

No. Bursa Malaysia removed GuocoLand (Malaysia) Berhad from its Official List on 18 August 2026 [3], after a privatisation by GLL (Malaysia) Pte Ltd, a wholly-owned subsidiary of GuocoLand Limited, through a selective capital reduction that paid the other shareholders RM1.10 a share [4][5]. The company is now GuocoLand (Malaysia) Sdn Bhd [6]; its parent, GuocoLand Limited, is listed on the Singapore Exchange [2].

How many projects has GuocoLand Malaysia completed?

In the KPKT register, 36 of the 44 housing projects under the seven companies counted here are completed, covering 8,001 of the 10,459 approved units. Most are Emerald Rawang phases (24, under GLM Emerald West (Rawang) and GLM Emerald East (Rawang)) and Emerald Sepang phases (7, under GLM Emerald (Sepang)); the rest are DC Residency at Damansara City (370 units), two projects under GLM Emerald Hills (Cheras) and two Emerald 9 phases.

Does GuocoLand Malaysia have any Sick or Abandoned projects?

No. As at 27 October 2026, the KPKT register classes none of the 44 projects as Sick (Sakit), Abandoned (Terbengkalai) or Late (Lewat). The 6 under construction are all recorded as on schedule (Lancar): an 810-unit Emerald 9 phase (19644-2, 51% reported progress), four phases of The Rise in Emerald Rawang (9722-17 to 9722-20, 106 units in all) and Bukit Rahman Putra Fasa 6 (5759-12, 1,352 units, Sabna Development Sdn Bhd). For the last, KPKT records a first sale agreement on 27 March 2007 and a handover deadline of 27 March 2010, with component progress reported between 30% and 100%. Two other projects are recorded with the permit cancelled.

Has GuocoLand Malaysia handed over its projects on time?

Of the 36 completed projects, 22 have both a handover deadline and a completion date in the KPKT register: 3 were handed over on or before the deadline (the extended deadline where KPKT approved an extension), 11 were handed over or certified complete after it, and 8 received the completion certificate before the deadline with no handover date recorded. The widest gaps are three early Pantai Sepang Putra phases in Emerald Sepang (7577-1, 7577-6 and 7577-7), with first sale agreements in 1998 and 2004, whose completion certificates are dated 9 November 2016, 3,762 to 5,792 days after their deadlines. 13 projects had the delivery period extended with KPKT approval.

Which companies develop Emerald 9 and Emerald Hills, and were they completed on time?

Emerald 9 is developed by GLM Emerald Square (Cheras) Sdn Bhd (KPKT 19644) and Emerald Hills by GLM Emerald Hills (Cheras) Sdn Bhd (KPKT 14068), both wholly owned by GuocoLand Malaysia [1]. KPKT records two completed Emerald 9 phases, 19644-1 (816 units, CCC 2 August 2023) and 19644-3 (1,072 units, CCC 31 March 2026), both before their extended deadlines of 10 April 2024 and 4 June 2026; a third phase, 19644-2 (810 units), is under construction with its deadline extended by 12 months to 10 October 2028. Emerald Hills (14068-1, 773 units) received its CCC on 15 August 2022, before its deadline as extended by 23 months to 29 May 2023. No handover date is recorded for these three completed projects.

Sources and how we checked

  1. Housing project records: KPKT TEDUH register (teduh.kpkt.gov.my), data as at 27 Oct 2026. Sumber: TEDUH, KPKT — used under the Government Open Data Terms of Use 1.0.
  2. [1] GuocoLand (Malaysia) Berhad Annual Report 2025 · GuocoLand (Malaysia) Berhad · 30 Oct 2025 · accessed 28 Oct 2026
    https://guocoland.com.my/wp-content/uploads/2025/12/Guocoland-Annual-Report-2025.pdf
  3. [2] Circular to shareholders and independent advice letter: proposed privatisation of GuocoLand (Malaysia) Berhad by way of a selective capital reduction and repayment exercise · GuocoLand (Malaysia) Berhad · 30 Apr 2026 · accessed 28 Oct 2026
    https://guocoland.com.my/wp-content/uploads/2026/04/Guocoland-Malaysia-Berhad-Circular-and-Independent-Advice-Letter.pdf
  4. [3] GuocoLand (Malaysia) Berhad — privatisation: removal from the Official List of Bursa Securities · GuocoLand (Malaysia) Berhad via SGX · 13 Aug 2026 · accessed 28 Oct 2026
    https://links.sgx.com/1.0.0/corporate-announcements/40YY01PRIU16YQ3V/900940_GLM_Approval%20on%20delisting.pdf
  5. [4] Proposed privatisation of GuocoLand (Malaysia) Berhad by way of a selective capital reduction and repayment exercise · GuocoLand Limited via SGX · 3 Feb 2026 · accessed 28 Oct 2026
    https://links.sgx.com/1.0.0/corporate-announcements/R3EMFOZTIXVAQN26/874004_GLL%20announcement-Gateway%203%20Feb%202026.pdf
  6. [5] GuocoLand to be delisted from Bursa Malaysia on Aug 18 · The Edge Malaysia · 13 Aug 2026 · accessed 28 Oct 2026
    https://theedgemalaysia.com/node/814475
  7. [6] About us · GuocoLand (Malaysia) Sdn Bhd · accessed 28 Oct 2026
    https://www.guocoland.com.my/about-us/

Last updated 28 Oct 2026