Home > Buy > Mont Kiara, Kuala Lumpur > Tangen Residences






+2From RM626,050Tangen ResidencesMont Kiara
1033 - 1582 sqft
3 - 4
-
-
Developer License No.
30349/01-2028/0026(N)
Advertisement and Sales Permit No.
30349-1/06-2027/0541(R)-(S)
License Validity Date
Start : 17 Jan 2023
End : 16 Jan 2028Permit Validity Date
Start : 28 Jun 2026
End : 27 Jun 2027Schedule Type
Schedule H
Construction Period
36 months + 12 months
Permit Status
Smooth
Property Details
Status
Under Construction
Completion year
1 - 2027 Q4
Project type
Residential, Highrise
Total units
413 Units
Land area
2.8 Acre
Block
1
Developer
Eng Han Group
Floor
1 - 49
Tenure
Freehold
Maintenance Fees
RM0.33psf (Including sinking fund)
Highlights
- Freehold 3 to 4 bedrooms
- 1,033–1,582 sqft family layouts
- SMK Segambut Jaya 440m away
- Completion listed for Q4 2027
- Priced from RM626,050
About This Property
Tangen Residences, North Kiara: A Freehold Sky Semi-D Residence by Eng Han
Tangen Residences is a 413-unit freehold high-rise in North Kiara, on the Segambut side of Mont Kiara in Kuala Lumpur, by Eng Han Group. Its 3 and 4-bedroom units of 1,033 to 1,582 sqft are priced from RM626,050. The 49-storey tower is under construction, with completion listed for Q4 2027. It suits families who drive and want family-sized space near Mont Kiara.
Who Tangen Residences suits – and who should skip it
It suits a family that wants 3 or 4 bedrooms in sky semi-D style layouts, per the developer, between Mont Kiara, Kepong and Desa ParkCity. It suits parents with teenagers, since SMK Segambut Jaya is 440m straight-line. Skip it if you rely on rail, because the nearest KTM station is a 20-minute walk. Skip it too if you need a home soon, since completion is listed for Q4 2027.
How connected is Tangen Residences?
KTM Segambut Utara (KA05A) is a 20-minute walk (1.6km), so plan for a short drive to rail. SMK Segambut Jaya is 440m, Taman Sri Sinar Park 510m, United Point Mall 955m and Pusat Perubatan ParkCity 1,473m straight-line. The site sits between Mont Kiara, Kepong and Desa ParkCity. DBKL zones the pocket residential (R3, plot ratio 3.5), pointing to moderate density around it.
Layouts and monthly costs at Tangen Residences
Units run 1,033 to 1,582 sqft across 3 to 4 bedrooms, in a 413-unit tower on about 2.8 acres. Maintenance is quoted at RM0.33 psf, including the sinking fund. The project is under construction and sold under the HDA, with completion listed for Q4 2027, so you pay in stages as it rises.
The Sifu View
The trade-off is space against location and the wait. You get a freehold 3 or 4-bedroom of at least 1,033 sqft in a 413-unit tower, with a school and park close by and a fee already published. The reason to hesitate is that the address is really Bukit Segambut rather than core Mont Kiara, rail is a 20-minute walk away, and you wait until Q4 2027 for keys from a smaller developer. Worth a look if you are a family that drives and wants room; skip it if you want walk-to-rail or a Mont Kiara address at resale.
Key facts
- Type: High-rise residence (sky semi-D concept)
- Developer: Eng Han Group
- Tenure: Freehold
- Total units: 413 (49 storeys on about 2.8 acres)
- Built-up: 1,033–1,582 sqft (3 to 4 bedrooms)
- Price: from RM626,050
- Status: Under construction – completion listed for Q4 2027, HDA
- Nearest rail: KTM Segambut Utara (KA05A), 20-minute walk (1.6km)
Pros and Cons
Layout Plans

Location Map
Good nearby
- StationSegambut Utara (KTM Komuter)20-minute walk · 1.6 km
- SchoolsSMK Segambut Jaya450 m
- SchoolsSK Taman Sri Sinar740 m
- SchoolsSMK Sinar Bintang770 m
- Shops and malls99 Speedmart350 m
- Shops and malls99 Speedmart750 m
- Clinics and hospitalsKlinik Mediviron760 m
- ParksTaman Sri Sinar Park480 m
Watch out for
- Sewage treatment plantIndah Water Sewerage Treatment Plant670 m
- CemeteryTanah Perkuburan Islam Segambut Dalam210 m
- 132 kV power line630 m
Distances are straight-line unless shown as a walk.
Is this price high or low for the area?
Of 8 similar-size launches still on sale within 3 km in a straight line, Tangen Residences has the 4th lowest net price per sq ft.
RM589 per sq ft against a nearby median of RM659, 11% lower.
- Mulberi Condominium0.8 kmRM522
- TuJu Residences2.5 kmRM586
- Tangen ResidencesThis projectRM589
- Papyrus North Kiara0.9 kmRM659
- Majestic @ Kiara Reserve2.8 kmRM884
Compares units of about 961 to 1601 sq ft that are still on sale, at net prices. A price comparison, not a valuation; it does not account for floor, facing, tenure or facilities.
Site Progress
Developer's progress report to KPKT (Ministry of Housing), checked 18 Nov 2026.
About the Developer: Eng Han Group
Tangen Residences is developed by Eng Han Group. Eng Han Group, which develops as EH Property, is a privately held Malaysian developer and builder with 16 housing projects in the KPKT register under five Eng Han companies we could confirm: 12 completed and 4 under construction, none classed Sick or Abandoned. It began in construction in 1992 and has developed property since 2005.
The Sifu View: Why It Matters for Tangen Residences
Tangen Residences is by Eng Han Group, which develops as EH Property and began in construction in 1992. The KPKT register shows 16 Eng Han housing projects, 12 completed and none classed Sick or Abandoned, and a builder background is the reassuring part. The group is privately held, so less is published than for a listed company, and this 413-unit project in North Kiara is not yet completed. A visit to a completed Eng Han building shows the finish and how it is managed, and PropertySifu can check the KPKT record and construction progress for you.
- Listing: No stock-exchange listing found — the Eng Han developer companies are private limited companies (Sdn Bhd)
- Founded: 1992, when Eng Han Bina was established (company account); property development since 2005
- Headquarters: Petaling Jaya, Selangor
- Experience (company figure): 34 years in construction and 21 years in property development, as stated on its website in 2026
- First property project: Taman Desa Penaga, Kulim, Kedah (2005)
- Where it builds (company list): Klang Valley and Seremban, Pahang, Terengganu, Penang, Kedah and Sabah
- Construction arm: EH Construction also builds for other developers; the group says it was an early adopter of the Industrialised Building System (IBS), with its own precast plant
- Full developer profile and KPKT record: Eng Han Group on PropertySifu
- Jogging Track
- Multi Purpose Hall
- Badminton
- Dance Floor
- Games Room
- Gymnasium
- Nursery
- Sauna
- Barbecue
- Garden
- Jacuzzi
- Playground
- Sky Lounge
- Swimming Pool
Developer track record
KPKT (Ministry of Housing) records · as of 2026-10-27
Eng Han Group and 4 related companies
No project is currently listed by KPKT as behind schedule, troubled or abandoned.
Source: TEDUH, KPKT. The group companies and their sources are listed on the developer page. Full developer record ›
Buyer Frequently Asked Questions
Mortgage Payment Calculator
Compare Bank Interest

Maybank
- Interest Rate from 3.60% p.a.
- Monthly Installment RM 2361.43

Public Bank
- Interest Rate from 3.55% p.a.
- Monthly Installment RM 2345.02

CIMB
- Interest Rate from 3.50% p.a.
- Monthly Installment RM 2328.67

Hong Leong Bank
- Interest Rate from 3.65% p.a.
- Monthly Installment RM 2377.90

RHB
- Interest Rate from 3.55% p.a.
- Monthly Installment RM 2345.02
3 Exclusive Benefits - Worth RM2,288
FREE Defect Check
Our professionals inspect your home for any defects.
FREE Moving Service
Includes a lorry and helpers to move you in hassle-free.
FREE Full House Cleaning
Move into a spotless, ready-to-live home.
Notice: Price shown is the SPA price. PM us for the special rebate!
I confirm that I have read and agree to the Terms Of Use and Privacy Policy.

























