New project in Kota Damansara, Selangor , by Asian Pac Holdings Berhad.
| Price range | RM 633,000 - 1,200,000 |
|---|---|
| Unit size | 905 - 1623 sqft |
| Bedrooms | 2 - 3 |
| Total units | 281 |
| Completion year | 2024 |
| Land area | 2.14 Acre |
| Maintenance fee | RM 0.385 per sqft included 10% sinking fund |
| Developer | Asian Pac Holdings Berhad |
| Developer license no. | 30011/03-2027/0010(N) |
| Advertising permit no. | 30011-1/04-2025/0014(N)-(S) |
| Schedule type | Schedule H |
| Construction period | 36 months |
Mahogany Residences is a completed leasehold condominium development in Kota Damansara, Selangor, by Bursa Malaysia-listed Asian Pac Holdings Berhad. Priced from RM633,000, the 281-unit scheme on a 2.14-acre site pairs a low-density, greenery-facing setting with proximity to a major MRT interchange.
Connectivity & Location
MRT/MRT Kwasa Damansara (KG04 / PY01) — the interchange between the Kajang and Putrajaya lines — is 851m straight-line from the site, a meaningful transit anchor. SMK Seksyen 10 Kota Damansara sits 304m and Taman Pekaka PKNS park 488m straight-line. Walk the actual route to the interchange when you view, as 851m is a moderate rather than doorstep distance.
Layouts & Living
Units run 905 to 1,623 sqft across 2 to 3 bedrooms — mid-to-large family layouts on a low-density scheme of just 281 units, with concierge and a full facilities deck. Maintenance is quoted at RM0.385 psf (including the 10% sinking fund). Completed in 2024, so you buy what you see: inspect the actual unit, the finishes and the common areas before committing.
The Sifu View
Mahogany's genuine appeal is a completed, low-density family condominium near an MRT interchange from a long-established listed developer — a solid own-stay where delivery risk is already behind you, with estimated instalments from about RM2,626/month (90% loan, 35 years, ~4.3%). But price it consciously: the range runs to RM1.2M at the top, it is leasehold, and the interchange is about 850m away rather than at the door. Inspect the finished product and speak to the management body about how the young building is being run before you decide.
Key Features
| Type | Size | Bedrooms | Bathrooms | Car parks |
|---|---|---|---|---|
| A | 905sqft | 2 | 2 | 2-3 |
| B | 1,033sqft | 2 | 2 | 2-3 |
| B1 | 1,055sqft | 2 | 1 | 2-3 |
| C | 1,178sqft | 2 | 3 | 2-3 |
| D | 1,121sqft | 2 | 3 | 2-3 |
| E | 1,623sqft | 3 | 4 | 2-3 |
| E1 | 1,623sqft | 3 | 4 | 2-3 |
KPKT (Ministry of Housing) filing (as of 2026-08-28): construction status "Siap Dengan CCC" (completed, CCC issued); 238 of 281 units sold across 1 phase; CCC issued 2024-08-08. Check any Malaysian project’s KPKT record
View floor plans, gallery and pricing for Mahogany Residences