PropertySifu is an Affirm Plus Properties Sdn Bhd site, founded by Hendry Lee. Sister products: RenHub for property agents and Cobroke.
New project in Sri Damansara, Selangor , by TA Global.
| Property type | Condominium (Highrise, Residential) |
|---|---|
| Unit size | 554 - 1230 sqft |
| Bedrooms | 1 - 3 |
| Total units | 1268 |
| Land area | 14.87 Acre |
| Maintenance fee | RM0.45psf (included sinking fund) |
| Developer | TA Global |
| Developer license no. | 11545/09-2027/0621(A) |
| Advertising permit no. | 11545-3/08-2027/0693(A)-(S) |
| Schedule type | Schedule H |
| Construction period | 36 months + 18 months |
Amaya Residence is a freehold residential development within the Damansara Avenue masterplan in Bandar Sri Damansara, Selangor, by TA Global (part of the TA Enterprise group). Priced from RM561,000, the 1,268-unit scheme forms part of a six-component mixed-use phase with a link bridge planned to the adjacent MRT station.
Connectivity & Location
MRT Sri Damansara Sentral (PY07, Putrajaya Line) is 465m straight-line, with the development's own link-bridge connection a key selling point. Twintech International University College is 639m, 8trium mall 867m, Sri Bestari International School 937m and Taman Tasik Menjalara 1,120m straight-line. The Damansara Avenue masterplan bundles residences, retail, offices, a hotel and a wellness hub.
Layouts & Living
Units run 554 to 1,230 sqft across 1 to 3 bedrooms — from compact investor formats to family cuts. The scheme is under construction with completion listed for 2028; confirm current progress and the VP date, and the status of the MRT link bridge, before committing. Maintenance is quoted at RM0.45 psf including the sinking fund.
The Sifu View
Amaya's genuine edge is transit-integration: a freehold home with a planned covered link to the Sri Damansara Sentral MRT, inside an integrated masterplan, from RM561,000 (indicatively around RM2,327/month; 90% loan, 35 years, ~4.3% p.a.; your figure varies). Buy it for a connected own-stay or rental. But underwrite it honestly: it is a large 1,268-unit scheme so resale and rental compete internally, the RM0.45 psf maintenance sits mid-to-high, and it is off-plan to 2028 — with the MRT link bridge a promised feature to confirm rather than assume. Verify progress and the link-bridge commitment before committing.
Key Features