Home > Buy > Seri Kembangan, Selangor > KAIA Heights







972 - 1586 sqft
3 - 3
-
-
Developer License No.
20047/02-2028/0391(A)
Advertisement and Sales Permit No.
20047-2/05-2027/0463(R)-(S)
License Validity Date
Start : 18 Feb 2023
End : 17 Feb 2028Permit Validity Date
Start : 01 Jun 2026
End : 31 May 2027Schedule Type
Schedule H
Construction Period
36 months + 17 months
Permit Status
Completed with CCC
Property Details
Status
Under Construction
Completion year
Block A - Aug 2025, Block B - Aug 2025, Block C - Nov 2026, Block D - Nov 2026
Project type
Residential, Highrise
Total units
924 Units
Land area
19.24 Acre
Block
Block A, Block B, Block C, Block D
Developer
UEM Sunrise Berhad
Floor
Block A - 30, Block B - 31, Block C - 28, Block D - 27
Tenure
Leasehold (Expiring on 18 September 2121)
Maintenance Fees
RM 0.35 per sqft included 10% sinking fund
Highlights
- All 3-bedroom 972–1,586 sqft
- Two parking bays per unit
- 517 units already completed
- From RM583,800
- MRT Taman Equine 1.9km
About This Property
KAIA Heights, Equine Park: A Leasehold Family Condominium by UEM Sunrise
KAIA Heights is a 924-unit leasehold condominium at Equine Park, Seri Kembangan, Selangor, by Bursa-listed UEM Sunrise, with the title running to 2121. Every unit is a 3-bedroom of 972 to 1,586 sqft with two parking bays, on 19.24 acres, priced from RM583,800. Two blocks of 517 units are completed, and a further block is listed for November 2026. It suits families who want space and a finished block to view.
Who KAIA Heights suits – and who should skip it
It suits a family that needs three proper bedrooms and two parking bays for two cars. It suits a buyer who wants to walk through finished blocks and facilities before paying, since two blocks are already done. It also suits someone who values open space, with about 8 acres of facilities planned when the whole project is completed. Skip it if you want to walk to the MRT, because the station is a 24-minute walk away. Skip it too if you want a small, low-ticket unit.
How connected is KAIA Heights?
MRT Taman Equine (PY36) on the Putrajaya Line is a 24-minute walk (1.9km), close enough for a feeder ride or a short drive but not a comfortable daily walk. The site sits in the Equine Park area of Seri Kembangan, so most errands and work trips are by car.
Layouts and monthly costs at KAIA Heights
Every unit is a 3-bedroom of 972 to 1,586 sqft, with two parking bays on the price list. Estimated instalments start from about RM2,422/month (90% loan, 35 years, ~4.3%; actual depends on your loan profile). Maintenance is quoted at RM0.35 psf including the 10% sinking fund. Two blocks totalling 517 units received their certificate of completion on 14 January 2025, and a further block is listed for November 2026.
The Sifu View
The trade-off is family space against distance from rail. Large 3-bedroom units with two parking bays, from a listed developer, with part of the project already finished, make a practical own-stay case. The reason to hesitate is the leasehold title to 2121, a 924-unit scheme sharing facilities, and an MRT that is a ride away rather than a walk. Units in different blocks are at different stages, so the block you buy into matters. Worth a look if you are a two-car family that wants space; skip it if you need rail on foot.
Key facts
- Type: Condominium
- Developer: UEM Sunrise Berhad
- Tenure: Leasehold (to 18 September 2121)
- Total units: 924 planned (on 19.24 acres)
- Built-up: 972–1,586 sqft (all 3 bedrooms)
- Price: from RM583,800
- Status: Two blocks (517 units) completed January 2025 – further block listed for November 2026
- Nearest rail: MRT Taman Equine (PY36), 24-minute walk (1.9km)
Pros and Cons
Layout Plans

Location Map
Good nearby
- StationTaman Equine (MRT Putrajaya)24-minute walk · 1.9 km
- SchoolsAlice Smith School770 m
- Shops and malls99 Speedmart360 m
- Shops and malls99 Speedmart590 m
- Clinics and hospitalsKlinik Fadzliyana650 m
- ParksBadminton Court770 m
Watch out for
- Sewage treatment plant890 m
Distances are straight-line unless shown as a walk.
Is this price high or low for the area?
Of 16 similar-size launches still on sale within 10 km in a straight line, KAIA Heights has the 5th lowest net price per sq ft.
RM541 per sq ft against a nearby median of RM577, 6% lower.
- Maxxon Residence8.6 kmRM470
- Ara Residences8.1 kmRM514
- KAIA HeightsThis projectRM541
- Akasa9.7 kmRM551
- COVO @ 16 Sierra4.3 kmRM561
Compares units of about 1006 to 1678 sq ft that are still on sale, at net prices. A price comparison, not a valuation; it does not account for floor, facing, tenure or facilities.
About the Developer: UEM Sunrise
KAIA Heights is developed by UEM Sunrise. UEM Sunrise Berhad, a Bursa Malaysia-listed developer controlled by UEM Group and ultimately Khazanah Nasional, has 112 housing projects in the KPKT register under 24 subsidiaries: 89 completed, 19 under construction and 4 with cancelled sales permits. None is classed Sick, Abandoned or Late. 69 are in Johor, 23 in Selangor and 20 in Kuala Lumpur.
The Sifu View: Why It Matters for KAIA Heights
UEM Sunrise is a listed, government-linked developer with a long record in high-rise residences, and its Mont'Kiara towers are there for anyone to inspect. For an off-plan buyer that lowers the 'will it be built, and built properly?' worry. It does not remove the need to check: a strong name can also mean a price that already includes the brand. Visit a completed UEM Sunrise condominium, compare the finish with what KAIA Heights specifies, and confirm the handover date in your agreement.
- Listing: Bursa Malaysia Main Market · UEMS (5148) · listed 18 November 2008, as UEM Land Holdings Berhad
- Founded: Listed in 2008 as UEM Land Holdings Berhad; merged with Sunrise Berhad in 2011; renamed UEM Sunrise Berhad in 2013
- Headquarters: Solaris Dutamas, Kuala Lumpur
- Land bank (company figure): 5,032.1 acres of remaining landbank with a remaining gross development value of RM87.9 billion, at 31 December 2025
- Major shareholder: UEM Group Berhad, 69.56%; ultimate holding company Khazanah Nasional Berhad
- Largest land bank (company statement): Iskandar Puteri, Johor
- Kiara Bay, Kepong: Registered under Mega Legacy (M) Sdn Bhd, a subsidiary in which UEM Sunrise indirectly holds 50% plus one share
- Full developer profile and KPKT record: UEM Sunrise on PropertySifu
- Basketball
- Futsal
- Jogging Track
- Badminton
- Gymnasium
- Playground
- Swimming Pool
- Library
- Multi Purpose Hall
- Reading Room
- Wading Pool
- Nursery
- Barbecue
- Jacuzzi
- Laundry
- Mini Market
Developer track record
KPKT (Ministry of Housing) records · as of 2026-10-27
UEM Sunrise Berhad and 23 related companies
No project is currently listed by KPKT as behind schedule, troubled or abandoned.
Source: TEDUH, KPKT. The group companies and their sources are listed on the developer page. Full developer record ›
Mortgage Payment Calculator
Compare Bank Interest

Maybank
- Interest Rate from 3.60% p.a.
- Monthly Installment RM 1985.02

Public Bank
- Interest Rate from 3.55% p.a.
- Monthly Installment RM 1971.22

CIMB
- Interest Rate from 3.50% p.a.
- Monthly Installment RM 1957.48

Hong Leong Bank
- Interest Rate from 3.65% p.a.
- Monthly Installment RM 1998.86

RHB
- Interest Rate from 3.55% p.a.
- Monthly Installment RM 1971.22
3 Exclusive Benefits - Worth RM2,288
FREE Defect Check
Our professionals inspect your home for any defects.
FREE Moving Service
Includes a lorry and helpers to move you in hassle-free.
FREE Full House Cleaning
Move into a spotless, ready-to-live home.
Notice: Price shown is the SPA price. PM us for the special rebate!
I confirm that I have read and agree to the Terms Of Use and Privacy Policy.




































