New project in Cheras, Kuala Lumpur, by Beaks Developer Sdn Bhd.
| Unit size | 859 - 859 sqft |
|---|---|
| Bedrooms | 3 - 3 |
| Total units | 1168 |
| Completion year | 2024 |
| Land area | 2.675 Acre |
| Developer | Beaks Developer Sdn Bhd |
| Developer license no. | 30024/03-2027/0023(A) |
| Advertising permit no. | 30024-1/04-2025/0011(N)-(S) |
| Schedule type | Schedule H |
| Construction period | 36 months + 12 months |
Pitta Residence (Residensi Pitta) is a leasehold high-rise residential development in the Taman Maluri / Taman Miharja pocket of Cheras, Kuala Lumpur, by Beaks Developer. It is a Residensi Wilayah affordable-housing scheme of two towers totalling 1,168 units, positioned within walking radius of the Miharja LRT corridor.
Connectivity & Location
LRT Miharja (AG12, Ampang Line) sits 517m straight-line, carrying a DBKL 7.5% TOD incentive. SMK Miharja is just 148m, Viva Mall 305m, TMC College 428m and Sunway Medical Centre Velocity 619m straight-line — a genuinely mature, amenity-dense pocket. Velo Garden (V Park) is 735m straight-line.
Layouts & Living
Units are a single standard size of 859 sqft with 3 bedrooms — a practical family layout typical of Residensi Wilayah stock. Project status, completion date and pricing are not stated on the card, and the developer's own description notes Bumi lots — confirm eligibility, price and VP timeline directly before proceeding.
The Sifu View
Pitta Residence's honest appeal is location: an affordable-tier home steps from the Miharja LRT and Sunway Velocity's amenities is a strong own-stay proposition for an eligible buyer. But go in with eyes open — as Residensi Wilayah stock there are eligibility conditions and resale/moratorium restrictions that limit it as a pure investment, pricing isn't shown here, and at 1,168 units it is a dense scheme. Confirm the scheme rules and your eligibility first; this is an own-stay home, not a quick-flip asset.
Key Features
| Type | Size | Bedrooms | Bathrooms | Car parks |
|---|---|---|---|---|
| A | 859 | 3 | 2 | 1 |
KPKT (Ministry of Housing) filing (as of 2026-08-28): construction status "Siap Dengan CCC" (completed, CCC issued); 1168 of 1168 units sold across 1 phase; CCC issued 2026-04-24. Check any Malaysian project’s KPKT record