Buyer Guides
Back

Home > Buy > Kepong, Kuala Lumpur > Kiara Bay Residensi AVA @ Kepong

share
Main

From RM567,800Kiara Bay Residensi AVA @ KepongOther, Kepong

HDA
  • 813 - 1285 sqft
  • 2+1 - 3
  • -
  • -

    Property Details

    • Status

      Completion

    • Completion year

      1 - 2024, 2 - 2024

    • Project type

      Residential, Highrise

    • Total units

      870 Units

    • Land area

      6.20 Acre

    • Block

      1, 2

    • Developer

      Mega Legacy (M) Sdn Bhd

    • Floor

      1 - 41, 2 - 41

    • Tenure

      Leasehold (2119)

    Highlights

    • Lake park 936m away
    • SMK Jinjang 252m straight-line
    • 2+1 to 3 bedrooms 813–1,285 sqft
    • Launched from RM567,800
    • Leasehold to 2119

    About This Property

    Kiara Bay Residensi AVA @ Kepong: A Leasehold Township Residence by UEM Sunrise and Melati Ehsan

    Kiara Bay Residensi AVA is a leasehold residential development of 870 units in two blocks on about 4.4 acres in Kepong, Kuala Lumpur, by Mega Legacy (M), a joint venture of UEM Sunrise and Melati Ehsan, and the first homes in the Kiara Bay township. The title runs to 2119; completed 2024. It launched from RM567,800 and is fully sold by the developer; units now change hands on the subsale market. It suits families who drive.

    Who Kiara Bay Residensi AVA @ Kepong suits – and who should skip it

    It suits a family with secondary-school children, since SMK Jinjang is 252m straight-line. It suits a household that likes outdoor exercise, with Taman Tasik Metropolitan Kepong, a large lake park, 936m away. It suits a buyer who wants a proper family layout, as every unit has 2+1 to 3 bedrooms. Skip it if you commute by rail, because the MRT is 1.9km away. Skip it too if you dislike construction around you, since the township is still building out.

    How connected is Kiara Bay Residensi AVA @ Kepong?

    MRT Kepong Baru (PY10) is a 25-minute walk (1.9km) from the site, so this is a car-first address: plan for a drive or feeder ride to the station. SMK Jinjang is 252m, Taman Tasik Metropolitan Kepong 936m and Selayang Mall 1,771m straight-line. DBKL zones the area for mixed development, in line with a township that will keep growing around you.

    Layouts and monthly costs at Kiara Bay Residensi AVA @ Kepong

    Units run 813 to 1,285 sqft across 2+1 to 3 bedrooms, family floor plans rather than investor studios. The building was completed in 2024, so you inspect the actual unit before you buy. The maintenance fee is not on our record; WhatsApp us and we'll check it for you.

    The Sifu View

    The trade-off is green space against car dependence. You get a family-sized unit near one of KL's largest lake parks, a secondary school down the road and a listed developer group behind the township. The reason to hesitate is access: the MRT is 1.9km away, so daily life runs on the car, and 870 units plus later township phases mean shared facilities and construction nearby for years. Worth a look if you are a driving family who values the lake park and a school close by; skip it if you need rail on foot.

    Key facts

    • Type: Residential high-rise (township)
    • Developer: Mega Legacy (M) Sdn Bhd (UEM Sunrise and Melati Ehsan JV)
    • Tenure: Leasehold (to 2119)
    • Total units: 870 (two blocks, about 4.4 acres)
    • Built-up: 813–1,285 sqft (2+1 to 3 bedrooms)
    • Price: Launched from RM567,800 – fully sold by developer
    • Status: Completed (2024)
    • Nearest rail: None within walking distance (car-first area); MRT Kepong Baru (PY10) 1.9km

    Pros and Cons

    Family Layouts By The Lake: Every unit has 2+1 to 3 bedrooms from 813 sqft, and Taman Tasik Metropolitan Kepong is 936m away for weekend jogs and evening walks with the kids.
    Secondary School Down The Road: SMK Jinjang is 252m straight-line, so teenagers can walk to school and you skip one of the most stressful drives of the family day.
    Longer Lease Than Most: The title runs to 2119, about 93 years from now, which keeps financing easy for you today and for the buyer who takes the unit over from you later.
    Car-First Address: MRT Kepong Baru is a 25-minute walk (1.9km). In practice every adult in the household will need a car or a feeder ride for work and errands.
    870 Units In Two Blocks: Expect lift queues at peak hours, busy pools at weekends and visitor-parking pressure, plus many similar units competing when you rent or sell.
    Township Still Building: As the first residential phase of Kiara Bay, later phases and commercial parts will be built around you, which can mean dust, noise and road works for years.

    Layout Plans

    Sale Price:
    Price (psf):
    Bed: 2+1
    Bath: 2
    Carpark: -

    Location Map

    Site Progress

    • 19 Aug 2022
      Progress as in Oct 2020
      • Progress as in Oct 2020

    Developer track record

    KPKT (Ministry of Housing) records · as of 2026-10-27

    Mega Legacy (M) Sdn Bhd and 23 related companies

    112 Projects registered
    89 Completed
    19 Under construction
    0 On KPKT’s watch list

    No project is currently listed by KPKT as behind schedule, troubled or abandoned.

    Source: TEDUH, KPKT. The group companies and their sources are listed on the developer page. Full developer record ›

    Buyer Frequently Asked Questions

    Is Kiara Bay Residensi AVA @ Kepong freehold or leasehold?▼
    What is the nearest rail station to Kiara Bay Residensi AVA @ Kepong and how far is it?▼
    How much do units at Kiara Bay Residensi AVA @ Kepong cost and what sizes are available?▼
    Who is the developer of Kiara Bay Residensi AVA @ Kepong and are they reliable?▼
    Is Kiara Bay Residensi AVA @ Kepong completed or still under construction?▼
    Is Kiara Bay Residensi AVA @ Kepong a good buy and who is it best suited to?▼

    Mortgage Payment Calculator

    Est. PaymentRM 2,142Per Month
    Property Price (RM)
    Down Payment (%)
    Interest Rate (%)
    Loan Term (Years)
    Total Amount Financed (RM)
    511,020
    Total Interest Payable (RM)
    388,499

    Need loan advice? Chat with a consultant to explore your options.

    whatsapp Now

    Compare Bank Interest

    • Maybank

      Maybank

      Interest Rate from 3.60% p.a.
      Monthly Installment RM 2141.71
    • Public Bank

      Public Bank

      Interest Rate from 3.55% p.a.
      Monthly Installment RM 2126.83
    • CIMB

      CIMB

      Interest Rate from 3.50% p.a.
      Monthly Installment RM 2112.00
    • Hong Leong Bank

      Hong Leong Bank

      Interest Rate from 3.65% p.a.
      Monthly Installment RM 2156.65
    • RHB

      RHB

      Interest Rate from 3.55% p.a.
      Monthly Installment RM 2126.83
    DownloadDownload E-Brochure

    3 Exclusive Benefits - Worth RM2,288

    • defect-check

      FREE Defect Check

      Our professionals inspect your home for any defects.

    • moving-service

      FREE Moving Service

      Includes a lorry and helpers to move you in hassle-free.

    • house-cleaning

      FREE Full House Cleaning

      Move into a spotless, ready-to-live home.

    Notice: Price shown is the SPA price. PM us for the special rebate!

    Get Special Rebate

    I confirm that I have read and agree to the Terms Of Use and Privacy Policy.

    Our Vision: To be the most hassle-free, transparent, and buyer-focused new property platform, where every buyer purchases with clarity and lives with peace of mind.

    Our Mission: Through genuine listings and personalized expert support, we match buyers with the most suitable homes and create a home-buying experience with true peace of mind.

    © 2026 PropertySifu.my. All rights reserved./Terms Of Use /Privacy Policy /Disclaimer

    WhatsApp Support
    WhatsApp Contact
    Enquire NowDownload Brochure
    Schedule Visit