Home > Buy > City Centre, Kuala Lumpur > Armani Residence @ Kampung Baru





472 - 900 sqft
1 - 3
-
-
Developer License No.
13975/10-2028/1180(A)
Advertisement and Sales Permit No.
13975-6/12-2027/1113(A)-(S)
License Validity Date
Start : 13 Oct 2023
End : 12 Oct 2028Permit Validity Date
Start : 06 Dec 2024
End : 05 Dec 2027Schedule Type
Schedule H
Construction Period
36 months
Permit Status
Smooth
Property Details
Status
Completion
Completion year
1 - 2027
Project type
Residential, Highrise
Total units
387 Units
Land area
0.59 Acre
Block
1
Developer
Armani Group
Floor
1 - 42
Tenure
Freehold
Maintenance Fees
RM0.44psf (including sinking fund)
Highlights
- Freehold in KL city centre
- Monorail Chow Kit 590m walk
- Quill City Mall 348m away
- 1 to 3 bedrooms 472–900 sqft
- Priced from RM446,400
About This Property
Armani Residence @ Kampung Baru, City Centre: A Freehold City-Core Serviced Residence by Armani Group
Armani Residence @ Kampung Baru is a 387-unit freehold serviced residence in the Chow Kit and Kampung Baru pocket of Kuala Lumpur's city centre, by Armani Group. Units are 472 to 900 sqft with 1 to 3 bedrooms, priced from RM446,400. It is under construction, about 36% built on KPKT records, with completion listed for December 2027. It suits city workers and landlords who want freehold near several rail lines.
Who Armani Residence @ Kampung Baru suits – and who should skip it
It suits a young professional working in the city centre who wants to walk to the Monorail or LRT instead of driving. It suits a landlord targeting city workers and students, with Quill City Mall 348m and Queen's College 142m away. Skip it if you want a calm, green neighbourhood: Chow Kit is dense, busy and gritty, and it is zoned for more high-density building. Skip it too if you need a large family home soon.
How connected is Armani Residence @ Kampung Baru?
Monorail Chow Kit (MR10) is an 8-minute walk (590m) and Monorail Medan Tuanku (MR9) a 10-minute walk (750m). LRT Sultan Ismail (AG5 / SP5) is 596m and KTM Putra (KA04) 974m straight-line, and LRT Dang Wangi (KJ12) is a 14-minute walk (1.1km). Quill City Mall is 348m and Laman Sultan Ismail 403m straight-line. Visit the street at night as well as by day, because the pocket feels different after dark.
Layouts and monthly costs at Armani Residence @ Kampung Baru
Units run 472 to 900 sqft across 1 to 3 bedrooms. Estimated instalments start from about RM1,852/month (90% loan, 35 years, ~4.3%; your figure depends on your loan profile). Maintenance is quoted at RM0.44 psf including the sinking fund. The build is about 36% complete on KPKT records, with completion listed for December 2027.
The Sifu View
The trade-off is location and price against neighbourhood. You get a freehold home in the KL core from RM446,400 with several rail lines and a mall within a short walk, which is rare at this ticket. The reason to hesitate is the setting: Chow Kit is a dense, gritty inner-city pocket zoned commercial at plot ratio 10, so expect years of construction around you, and the developer is a smaller private group. Worth a look if you work in the city and want to walk to rail; skip it if you want quiet streets or a large family home.
Key facts
- Type: Serviced residence
- Developer: Armani Group
- Tenure: Freehold
- Total units: 387 (on 0.59 acre)
- Built-up: 472–900 sqft (1 to 3 bedrooms)
- Price: from RM446,400
- Status: Under construction (about 36% built) – completion listed December 2027
- Nearest rail: Monorail Chow Kit (MR10), 8-minute walk (590m)
Pros and Cons
Layout Plans

Location Map
Good nearby
- StationChow Kit (KL Monorail)8-minute walk · 590 m
- StationSultan Ismail (LRT Ampang, LRT Sri Petaling)590 m
- SchoolsSMK Puteri Wilayah200 m
- SchoolsSK Kampung Bharu310 m
- SchoolsSK KHAS Pendidikan Khas Kg Baharu370 m
- Shops and mallsMydin160 m
- Shops and mallsKedai Buah Buahan Leong Sut Kee200 m
- Clinics and hospitalsKlinik Rawatan Dr. Mahmud200 m
- Clinics and hospitalsPusat Dialisis Aiman270 m
- ParksLaman Sultan Ismail400 m
- ParksLaman Medan Tuanku430 m
Watch out for
- CemeteryPerkuburan Islam Jalan Ampang940 m
- Power substationPencawang Masuk Utama Vision City250 m
Distances are straight-line unless shown as a walk.
About the Developer: Armani Group
Armani Residence @ Kampung Baru is developed by Armani Group. Armani Group is a privately held Malaysian developer whose companies have 26 housing projects in the KPKT register: 10 completed, 14 under construction and 2 not yet started, none classed Sick or Abandoned. Founded in Ipoh in 2010 and now based in Shah Alam, it builds mainly condominiums and serviced apartments in Kuala Lumpur and Selangor.
The Sifu View: Why It Matters for Armani Residence @ Kampung Baru
Armani Residence @ Kampung Baru is already completed, so the building can be seen as it stands. Its developer, Armani Group, is privately held and has 26 housing projects in the KPKT register: 10 completed, 14 under construction and two not yet started, none classed Sick or Abandoned. The thing to weigh is how the 387-unit freehold building is managed day to day, since the developer publishes less than a listed group. A visit shows the finish, the lifts and common areas, and PropertySifu can check the KPKT record for you.
- Listing: Not listed — the Armani developer companies are private limited companies (Sdn Bhd)
- Founded: 2010 in Ipoh, Perak, according to The Edge (2025)
- Headquarters: Seksyen U1, Shah Alam, Selangor
- Developments listed by the group: 31 on its website, from condominiums and serviced apartments to landed homes, shoplots and industrial parks (October 2026)
- Link with Magna Prima: Wong Sze Chien and Datuk Seah Ley Hong own 54.96% of Bursa-listed Magna Prima Berhad through Hallson Holdings Sdn Bhd; Magna Prima owns the Armani Hallson KLCC site and Armani has the full development rights (2026)
- Armani Hallson KLCC company: Armani Hallson KLCC Sdn Bhd, formerly Golden Rainbow View Sdn Bhd; shareholders Wong Sze Chien, Azlan Azmi and Maybank Trustees Bhd (2026)
- Full developer profile and KPKT record: Armani Group on PropertySifu
- Multi Purpose Hall
- Wading Pool
- Gymnasium
- Sauna
- Swimming Pool
KL Monorail
Medan Tuanku
LRT Ampang Line
Sultan Ismail
Developer track record
KPKT (Ministry of Housing) records · as of 2026-10-27
Armani Group and 12 related companies
No project is currently listed by KPKT as behind schedule, troubled or abandoned.
Source: TEDUH, KPKT. The group companies and their sources are listed on the developer page. Full developer record ›
Buyer Frequently Asked Questions
Mortgage Payment Calculator
Compare Bank Interest

Maybank
- Interest Rate from 3.60% p.a.
- Monthly Installment RM 1683.80

Public Bank
- Interest Rate from 3.55% p.a.
- Monthly Installment RM 1672.10

CIMB
- Interest Rate from 3.50% p.a.
- Monthly Installment RM 1660.44

Hong Leong Bank
- Interest Rate from 3.65% p.a.
- Monthly Installment RM 1695.54

RHB
- Interest Rate from 3.55% p.a.
- Monthly Installment RM 1672.10
3 Exclusive Benefits - Worth RM2,288
FREE Defect Check
Our professionals inspect your home for any defects.
FREE Moving Service
Includes a lorry and helpers to move you in hassle-free.
FREE Full House Cleaning
Move into a spotless, ready-to-live home.
Notice: Price shown is the SPA price. PM us for the special rebate!
I confirm that I have read and agree to the Terms Of Use and Privacy Policy.

































