PropertySifu is an Affirm Plus Properties Sdn Bhd site, founded by Hendry Lee. Sister products: RenHub for property agents and Cobroke.
New project in Bukit Gambier, Pulau Pinang, by Pinnacle Homes Sdn Bhd.
| Property type | Condominium (Highrise, Residential) |
|---|---|
| Unit size | 1077 - 1734 sqft |
| Bedrooms | 3 - 4 |
| Total units | 982 Units |
| Land area | 7.96 Acre |
| Maintenance fee | RM 0.23 per sqft included 10% sinking fund |
| Developer | Pinnacle Homes Sdn Bhd |
| Developer license no. | 31061/06-2030/0117(N) |
| Advertising permit no. | 31061-1/09-2028/0781(N)-(S) |
| Schedule type | Schedule H |
| Construction period | 54 Months |
Pinnacle Bukit Gambier is a freehold residential development in Bukit Gambier (Gelugor), Penang island, by Pinnacle Homes. Priced from RM646,800, the 982-unit scheme marks the developer's Penang debut, built around a nature-led design with a large share of green space, close to Universiti Sains Malaysia.
Connectivity & Location
SMK Bukit Gambir is 318m straight-line, Raffel Park 516m and Universiti Sains Malaysia (USM) 1,189m straight-line — a school-and-university radius that suits families and the academic catchment. The card carries no rail POI (Penang island has no urban rail line today), so this is a car-first address; check road access and the USM-area traffic yourself.
Layouts & Living
Units run 1,077 to 1,734 sqft across 3 to 4 bedrooms — genuinely family-sized. The developer states a high proportion of green space for a cooler, breezier setting. The scheme is under construction with completion listed for Q3 2029; confirm current progress and the VP date before committing. Maintenance is quoted at a low RM0.23 psf including the 10% sinking fund.
The Sifu View
Pinnacle Bukit Gambier's honest appeal is a freehold, family-sized, green-design home in an education-anchored Penang pocket, with a notably low RM0.23 psf maintenance and an indicative RM2,683/month entry (90% loan, 35 years, ~4.3% p.a.; your figure varies). The USM catchment also supports steady tenant interest. But underwrite it honestly: there is no urban rail on Penang island so you'll rely on the car, it is a large 982-unit scheme with the density that implies, and it is off-plan with a distant Q3 2029 completion — a long wait on the developer's first Penang project, so confirm progress and its delivery track record before committing.
Key Features
View floor plans, gallery and pricing for Pinnacle Bukit Gambier