New project in Bandar Kinrara, Selangor , by FAJARBARU LAND SDN BHD.
| Price range | RM 300,000 |
|---|---|
| Unit size | 900 - 900 sqft |
| Bedrooms | 3 - 3 |
| Total units | 1604 |
| Completion year | 2022 |
| Developer | FAJARBARU LAND SDN BHD |
| Developer license no. | 20256/03-2027/0176(R) |
| Advertising permit no. | 20256-1/03-2024/0225(A)-(S) |
| Schedule type | Schedule H |
| Construction period | 36 months + 12 months |
Vierra Residence is a freehold high-rise residential development in Bandar Kinrara, Puchong (Selangor), by Fajarbaru Builder Group, a Bursa-listed construction and property group. Priced from RM300,000, it is an affordable-tier address aimed at first-home buyers on the Puchong fringe.
Connectivity & Location
LRT Kinrara BK5 (SP22) is 931m straight-line from the site, and a Tamil primary school (SJK (T) Kinrara) is a close 118m straight-line. The BK1 park is 618m and Master Weld Academy 719m straight-line. The everyday grid of Bandar Kinrara — schools, shops and highway links — sits within a short radius.
Layouts & Living
Units are a single 3-bedroom layout of 900 sqft, in a large 1,604-unit scheme. The card does not state a completion date or status, so confirm the current VP position before committing.
The Sifu View
The genuine appeal is a freehold three-bedroom home in an established Puchong township from RM300,000 — a rare affordable entry point, backed by a listed developer group. It suits a first-time own-stayer who wants space and location over prestige. But price the trade-offs honestly: at 1,604 units this is a high-density block, so lift queues, facility crowding and a large pool of near-identical units at resale are real considerations. The LRT is close to a kilometre away straight-line, and a single 900 sqft layout means limited differentiation — buy it for the fundamentals, not for uniqueness.
Key Features
| Type | Size | Bedrooms | Bathrooms | Car parks |
|---|---|---|---|---|
| A1 | 900 | 3 | 2 | 1 |
| A2 | 900 | 3 | 2 | 1 |
| B1 | 900 | 3 | 2 | 1 |
| B2 | 900 | 3 | 2 | 1 |
KPKT (Ministry of Housing) filing (as of 2026-08-28): construction status "Siap Dengan CCC" (completed, CCC issued); 1604 of 1604 units sold across 1 phase; CCC issued 2025-09-29. Check any Malaysian project’s KPKT record